The Status of Geothermal Energy Development in Indonesia up to the Year 2000
- Key words
- Exploration; Indonesia; Assessment; Case History
- Location
- Indonesia
- Conference
- Geothermal Resources Council Transactions
- Year
- 1985
- Session
- Exploration; Energy policy
- Language
- English
Abstract
The electric power sector in Indonesia will be expanded with an additional generating capacity of about 5255 MW at the end of the fourth Five Year Development Plan, 1984/1985 to 1988/1989, from the existing 3912 MW. At present a 30 MW geothermal condensing plant and two noncondensing monobloks of 2 MW and 25 kW have been operating successfully since 1979. Geothermal energy will be developed primarily for electric power and a total of 220 MW, 660 MW and 550 MW will be added during Repelita IV (1984-1989), Repelita V (1989-1994), and 1995 and up to the year 2000, for a total capacity of nearly 1500 MW. These geothermal plans and programmes will accelerate exploration of 18 areas in Sumatera; 29 in Java, 16 in Sulawesi; and 14 in Bali, the Lesser Sunda Island, and Mollucas (figure 1).
Copyright 1985, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.