Conference Papers Database New search

The First Two Years of Operation of Tongonan I, Leyte, Philippines, A Variable Load Geothermal Power Plant

Vasquez, Nazario C.

Key words
Power Generation; Production; Exploration; Philippines; Leyte; Tongonan; Gathering System; Geophysics; Schlumberger; Erosion; Corrosion
Location
Tongonan, Philippines
Conference
Geothermal Resources Council Transactions
Year
1985
Session
Exploration; Geophysical surveys; Reservoir modeling; Reserv
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

IN the early stages of geothermal power development in the Philippines, it had always been assumed that a geothermal power plant is good only for base load application. Against this entrenched belief, Tongonan I, a 112.5 MW geothermal power plant on the island of Leyte in the Philippines, was commissioned. It was no only intended to be a variable load plant but also it is the only major electricity source on the island. This paper discusses the first 2 years of operation of Tongonan I. It reports the successful operation of this plant. Likewise, the difficulties encountered in the operation are stated.

Copyright 1985, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 28 September 2026, 4:36 pm.