Conference Papers Database New search

Geothermal Power Plants Unravelled -- Putting the Pieces Together

Kleijn, Hans R.

Key words
Power Generation; Economics; Design; Regulations; Finding; Contracts; Project Funding
Conference
Geothermal Resources Council Transactions
Year
1985
Session
Power plant design and operation; Operations management; Bus
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Conceiving and subsequently designing and constructing geothermal power plants and (or) associated heat generating facilities is complex because of the multitude of technologies and legalities involved. The number of active participants in the majority of projects is relatively large and interfaces are complicated. This paper deals with an outline of the problem areas, in particular in the Balance of Plant area. How to subdivide the relevant contracts to obtain the required optimized division and organization of work in conjunction with influence on execution and responsibility/liability is another item for consideration. Balance of Plant contractors can make a major contribution. Funding projects through the route of "industrial real estate" appears to be a breakthrough in realizing these industrial facilities.

Copyright 1985, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 30 September 2026, 9:28 am.