Conference Papers Database New search

Present Status and Future Development of the Denizli-Kizildere Geothermal Field of Turkey

Simsek, Sakir

Key words
Exploration; Power Generation; Direct Use; Geophysics; Hydrology; Injection; Country Update
Location
Denizli, Turkey; Kizildere, Turkey
Conference
Geothermal Resources Council Transactions
Year
1985
Session
Geothermal overviews; Exploration; Geological surveys; Geoch
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Kizildere Geothermal Field is the first field developed in Turkey. The field is situated in the Buyuk Menderes graben, near the city of Denzali in western Anatolia. Geological, geophysical, and geochemical studies, drilling and testing have been carried out in this field by the MTA General Directorate. Kizildere has been proven as a high temperatures, hot water dominated geothermal field by drilling 16 deep wells having reservoir temperatures of 170 to 212°C. The wells were drilled between 1968 to 1973. A 20.6 MW power plant was installed by the Turkish Electricity Authority in 1984. Besides electricity production, integrated utilization is planned. It is necessary to solve scaling and waste water disposal problems, as well as to explore the possibility of a deeper, third reservoir for maintaining the efficiency of the existing power plant and field development.

Copyright 1985, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 30 September 2026, 10:15 am.