Long-Term Dipole-Dipole Resistivity Monitoring at the Cerro Prieto Geothermal Field
- Key words
- Exploration; Research Agencies; Reservoir Engineering; LBL; Models; Numerical Simulation; DOE; Kyushu University Japan; Influx
- Location
- Cerro Prieto, Mexico
- Conference
- Geothermal Resources Council Transactions
- Year
- 1984
- Session
- Exploration; Resistivity surveys; Geophysical surveys
- Language
- English
Abstract
Dipole-dipole resistivity measurements for the combined purposed of reservoir delineation and reservoir monitoring were first made at Cerro Prieto in 1978 and have continued on approximately an annual basis since then. Two 20 km long dipole-dipole lines with permanently emplaced electrodes at 1 km spacings were established over the field area. Resistivity remeasurements have been made on one lien at 6 to 18 month intervals using a 25 KW generator capable of up to 80A output and a microprocessor controlled signal averaging receiver. This high power low noise system provided highly accurate measurements even at large transmitter receiver separations. Standard error calculations for collected data indicate errors less than 5% for all points.
Copyright 1984, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.