Heber Binary Project

Nelson, Tiffany T.

Key words
Power Generation; Utilities; Economics; USA; California; Imperial; Heber; Binary Systems; Power Plant Cycle; Isobutane; Pentane; Design; Turbines; Heat Exchangers; Materials; Tube and Shell; SDG&E; Brine contract; Construction; Progress Report; Demonstrat
Location
Imperial Valley; Heber, California
Conference
Geothermal Resources Council Transactions
Year
1984
Session
Economics; Binary cycle power generation; Turbines; Heat exc
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Sine its inception in 19080, the Heber Binary Project has made significant progress towards it goal of demonstrating the economic and operational viability of a commercial scale, binary cycle, geothermal power plant. Plant design and engineering have been completed, and all major equipment has been received at the site. Construction at the site began June 1983, and the major mechanical and electrical contracts were awarded in the Spring of 1984. Plans for manning the plant and conducting the demonstration phase of the Project are well underway to support a turbine roll in April 1985.

Copyright 1984, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.