Final Report on HGP-A Wellhead Generator Proof-of-Feasibility Project

Chen, Bill H.; Lopez, Louis P.

Key words
USA; Hawaii; Wellheads; Turbine Blades; Injection; Efficiency; Steam; MWe
Location
Puna, Hawaii
Conference
Geothermal Resources Council Transactions
Year
1982
Session
Power plant design and operation; Feasibility studies; Envir
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The construction of the 3 MW geothermal power plant at HGP-A well was completed in June, 1981. The HGP-A started production on June 12, 1981. Numerous problems developed during the plant startup and shakedown periods. However, the pant was formally turned over to Hawaii Electric Light Company (HELCO), the local utility company on March 1, 1982. Currently, all systems are functioning well and all major objectives have been met. The plan is to operate the power plant though 1990 where long term equipment and material information and reservoir characteristics can be obtained.

Copyright 1982, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.227 (216.73.216.227).
Viewed 23 September 2026, 6:27 am.