Conference Papers Database New search

Geothermal Power Development in Indonesia

Shulman, Gary

Key words
Exploration; Brine Technology; Indonesia; Java; Bali; Sumatra; Assessment; MWe; Scrubbers; Annual Report; GENZL; Development
Location
Kawah Kamojang, Indonesia; Java; Dieng, Indonesia
Conference
Geothermal Resources Council Transactions
Year
1981
Session
Geothermal overviews; Power plant design and operation
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Indonesia consisting of a volcanic island group with a large population has a growing need for electric power to partially replace oil consumption and is rapidly developing its geothermal resources. Geothermal studies of the area for approximately 50 year have culminated in the development of the Kamojang field with New Zealand and assistance where 90 MW will be installed. The first 250 MW power station was installed in 1978. Six geothermal areas have been selected by the government for early development in Java and Bali. A geothermal steam cleaner has been installed at Kamojang to reduce turbine maintenance requirements representing a new state of the art development. At Dieng in Central Java wells have located a geothermal reservoir at 2000 meters depth and a potential for 1000 to 2000 MW has been estimated for that region. A 2000 KW power station was started up in March 1981 at Dieng where several villages will be served for the first time.

Copyright 1981, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.