Brief Commentaries of the Generation in the Main Plant in Cerro Prieto
- Key words
- Production; Exploration; Mexico; Cerro Prieto; Field Management; Geology; MWe; Operating Design; Flash Plants; Wells; Low Pressure; Maintenance
- Location
- Cerro Prieto, Mexico
- Conference
- Geothermal Resources Council Transactions
- Year
- 1981
- Session
- Exploration; Power plant design and operation; Flash steam p
- Language
- English
Abstract
The generation of 75,000 Kw, with turbines 1 and 2, of 37,500 Kw, for each one, started in the years 1973, with excellent results, that for 1979, the capacity of the Main Plants was increased, with the turbines 3 and 4, similar to the first ones, reaching the total of 150,000 Kw, for this year turbine number 5 should enter the system of low pressure which would generated 30,000 Kw or more.
Copyright 1981, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.