Improving Geothermal Power Plant Performance by Repowering with Bottoming Cycles

Uri Kaplan, Daniel N. Schochet

Key words
Power Plants, Bottoming Cycles
Conference
World Geothermal Congress
Year
2005
Session
13. Power Generation
Language
English
Paper number
1341

Full text

198KB, opens in a new tab

Abstract

Additional generating capacity may be obtained in a cost effective manner by re-powering of existing geothermal power plants utilizing otherwise untapped geothermal energy, without drilling new wells. Often this re-powering also provides additional environmental benefits. The ability to increase power production, by modest amounts can lead to significant increase in profitability for operating plants.
This presentation looks at the case histories of several geothermal re-powering applications, including the 5MW brine recovery binary power plant at the Brady power plant in Nevada installed in August of 2002, the 10 MW brine recovery binary power plant at Momotombo in Nicaragua installed in early 2003. and the 20 MW Miravalles V brine recovery plant installed by ICE Costa Rica. With geothermal power plant owners and operators concerned with costs and competition, increasing plant output by re-powering, with its incremental advantages, is a highly desirable and cost effective option.

Copyright 2005, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.131 (216.73.217.131).
Viewed 22 September 2026, 4:47 pm.