SMUDGEO #1 Economic Impacts on Geothermal Power Plant Design

Tucker, Robert E.; Kleinhans, Paul V., Jr.; Keilman, L. R.

Key words
Power Generation; USA; California; The Geysers; Efficiency; Operational; Economics; Four flow machine
Location
The Geysers, California
Conference
Geothermal Resources Council Transactions
Year
1980
Session
Economics; Power plant design and operation; Turbines
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The Sacramento Municipal Utility District (SMUD) is currently in the design phase of geothermal power plant located in the Geysers area of Northern California. The unit, SMUDGEO #1 has a turbine nameplate rating of 55 Mwe at 4.0 in hgA, and is expected to be in commercial operation by December 1983. The benefits of efficient steam utilization for SMUDGEO #1 differ greatly from other units already installed due to the purchase of geothermal stem on a "per pound" basis. For this reason, SMUDGEO #1 will be the most efficient yet installed in the Geysers area. This paper describes the efficient conscious design of the turbine cycle.

Copyright 1980, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 26 September 2026, 7:16 am.