Raft River 5-MW(e) Geothermal Pilot Plant Project

Rasmussen, T. L.; Whitbeck, J. F.

Key words
Power Generation; Well Pumps; USA; Idaho; Raft River; Pilot Plant; Dual boiling power cycle; Isobutane; Evaluation; Submersible well pumps
Location
Raft River, Idaho
Conference
Geothermal Resources Council Transactions
Year
1980
Session
Power plant design and operation; Binary cycle power generat
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The Raft River 5-MW(e) Pilot Plant Project was started in 1976. Construction is scheduled for completion in July 1980, with three years of engineering and operation testing to follow. The plant utilized a 280°F geothermal fluid energy source and a dual boiling isobutane cycle. Developmental efforts are in progress in the areas of downhole pumps and chemical treatment of geothermal fluids for cooling tower makeup.

Copyright 1980, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 26 September 2026, 8:21 am.