Recent Development of 30 MW Kamojang Geothermal Power Project, West Java, Indonesia

Basoeki, Mohammed; Radja, Vincent T.

Key words
Power Generation; Exploration; Indonesia; West Java; Kamojang; Cooling Towers; Flash Plants; Steam Turbines; Generators; Geochemistry; Geology
Location
Java; Kawah Kamojang, Indonesia
Conference
Geothermal Resources Council Transactions
Year
1978
Session
Exploration; Geothermal overviews; Reservoir engineering
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

This paper has been prepared to discuss various problems of geothermal energy studies for the development of the Kamojang field in West java, Indonesia for the production of 30 MW power plant capacity. These studies, carried out by the Indonesian Government in cooperation with the New Zealand Government, are primarily based on the information gained during reconnaissance survey, initial investigation, and exploration and production wells testing. Production drilling of ten wells started in 1976 followed by design of structural, mechanical and electrical equipment, and the steam gathering system. The construction of this power plant required approximately 48 months. The jobs occur in three major phases: (1) site development (2) foundation and building construction, and (3) equipment installation. With successful production drilling, design and construction of this project, the Indonesian engineers will gain valuable experience.

Copyright 1978, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 25 September 2026, 12:23 am.