Conference Papers Database New search

Maintenance History of a Geothermal Plant: Svartsengi Iceland

Geir Thorolfsson

Key words
Power plant, maintenance
Location
Svartsengi, Iceland
Conference
World Geothermal Congress
Year
2005
Session
20. Corrosion and Scaling
Language
English
Paper number
2037

Full text

525KB, opens in a new tab

Abstract

The maintenance of a geothermal plant is very dependent on local factors, namely, the geothermal system, location, weather, and climate. During the 28 years of operation of the Svartsengi geothermal power plant, almost every type of problem imaginable has come up, for example, corrosion, stress corrosion cracking, scaling, erosion, and slug flow.

A district heating plant must be extremely reliable. There is no "spare" district heating plant, unlike in a good electrical grid system where there are usually redundancies and "spinning reserves".

In this paper, the operation of the Svartsengi geothermal power plant will be described, how it was built in various stages, and what have been the most maintenance intensive issues. Solutions to various problems are also described.

Copyright 2005, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.146 (216.73.216.146).
Viewed 22 September 2026, 3:37 pm.