Conference Papers Database New search

Rehabilitation and Modernization Project for Unit 5 of Cerro Prieto Power Plant

Ismael Canchola Felix

Key words
Units modernization and rehabilitation, Residual energy utilization,Secondary steam utilization, Efficiency improvement,Cerro Prieto
Location
Cerro Prieto, Mexico
Conference
World Geothermal Congress
Year
2005
Session
13. Power Generation
Language
English
Paper number
1318

Full text

42KB, opens in a new tab

Abstract

This project includes the increase of steam production in the field using the surplus energy from the separated water as the repowering of the Unit 5 rated 30 MW. This repowering considers the cooling tower substitution, turbine rehabilitation and non condensable gas extraction system.

Copyright 2005, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.100 (216.73.217.100).
Viewed 21 September 2026, 6:13 am.