Reassessment of Kizildere Geothermal Power Plant after 20 Years of Exploitation
- Key words
- Kizildere, Power plant, Geothermal
- Location
- Kizildere, Turkey
- Conference
- World Geothermal Congress
- Year
- 2005
- Session
- 13. Power Generation
- Language
- English
- Paper number
- 1315
Full text
156KB, opens in a new tab
Abstract
In this study, first, information on Kizildere geothermal system, the power plant and its 20 years power generation are presented. Then, single flash cycle, possible double flash and binary cycle's applications for Kizildere geothermal power plant are evaluated, and the results are reported. Moreover, the alternative cycles in question are evaluated from the reservoir chemistry viewpoint. Furthermore, economics of the existing Kizildere geothermal power plant are also studied and the results are submitted.
Copyright 2005, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.