Conference Papers Database New search

Geothermal Power Development in Guatemala 2000-2005

Alfredo RenÈ Rold·n Manzo

Key words
Geothermal, Electricity, GEF
Location
Guatemala
Conference
World Geothermal Congress
Year
2005
Session
1. Country Updates
Language
English
Paper number
0133

Full text

218KB, opens in a new tab

Abstract

Activities related with Geothermal Power Development in Guatemala during the period 2000-2005 mainly include those carried out by Inde, the Government institution in charge of the electricity in the country and some others by private companies.
Since 1992, Inde has five geothermal areas in reserve to develop, they are: Zunil, Amatitl·n, Tecuamburro, San Marcos and Moyuta.
From 1999 to date Inde has been working in the maintenance and operation of Zunil I and Amatitl·n reservoirs.
There is a 24 MW binary cycle geothermal power plant operated by Orzunil I de Electricidad Ltda. in Zunil I, that has produced an average of 150 GW per year.
In Amatitl·n, Inde is actually producing electricity with a 5 Mw portable plant.
For 2005 it's expected to produce 49.5 Mw of geothermal electricity, 24 MW in Zunil I, 5 MW in Zunil II and 20.5 MW in Amatitl·n, and the equivalent of 10 Mw of direct use of this kind of energy.

Copyright 2005, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.217.142 (216.73.217.142).
Viewed 21 September 2026, 5:19 pm.